Some frequently asked questions on the land acquisition,
resettlement and rehabilitation Bill:
What is the significance of the new title ‘The right to fair
compensation and transparency in land acquisition, rehabilitation and
resettlement Bill 2012’?
The title of the old law conveyed that its primary purpose was to
expedite the acquisition of land. However, the principle objective of the new
Bill is fair compensation, thorough resettlement and rehabilitation of those
affected, adequate safeguards for their well-being and complete transparency in
the process of land acquisition. The title has been amended to reflect
this.
Why is there a need for a new Bill?
There is unanimity of opinion across the social and political
spectrum that the current Law (The Land Acquisition Act 1894) suffers from
various shortcomings. Some of these include:
• Forced acquisitions: Under the 1894 legislation once the
acquiring authority has formed the intention to acquire a particular plot of
land, it can carry out the acquisition regardless of how the person whose land
is sought to be acquired is affected.
• No safeguards: There is no real appeal mechanism to stop the
process of the acquisition. A hearing (under section 5A) is prescribed but this
is not a discussion or negotiation. The views expressed are not required to be
taken on board by the officer conducting the hearing.
• Silent on resettlement and rehabilitation of those displaced:
There are absolutely no provisions in the 1894 law relating to the resettlement
and rehabilitation of those displaced by the acquisition.
• Urgency clause: This is the most criticised section of the Law.
The clause never truly defines what constitutes an urgent need and leaves it to
the discretion of the acquiring authority. As a result almost all acquisitions
under the Act invoke the urgency clause. This results in the complete
dispossession of the land without even the token satisfaction of the processes
listed under the Act.
• Low rates of compensation: The rates paid for the land acquired
are the prevailing circle rates in the area which are notorious for being
outdated and hence not even remotely indicative of the actual rates prevailing
in the area.
• Litigation: Even where acquisition has been carried out the same
has been challenged in litigations on the grounds mentioned above. This results
in the stalling of legitimate infrastructure projects.
• Recent observations by the Supreme Court: Justice Ganpat Singhvi
of the Supreme Court has observed, in the wake of repeated violations that have
come to light over the last few months, that the law has “become a fraud”. He
observed that the law seems to have been drafted with “scant regard for the
welfare of the common man”.
• Another bench of the Supreme Court has echoed this sentiment in
its observation that “[T] he provisions contained in the Act, of late, have been
felt by all concerned, do not adequately protect the interest of the land
owners/persons interested in the land. The Act does not provide for
rehabilitation of persons displaced from their land although by such compulsory
acquisition, their livelihood gets affected …To say the least, the Act has
become outdated and needs to be replaced at the earliest by fair, reasonable and
rational enactment in tune with the constitutional provisions, particularly,
Article 300A of the Constitution. We expect the law making process for a
comprehensive enactment with regard to acquisition of land being completed
without any unnecessary delay.”
Why does the government need to acquire land for private
companies as well as public-private partnership projects?
• If land is purchased then there are no benefits for livelihood
losers who are usually far greater in number than the land owners. This Bill
ensures that they are taken care of and not simply displaced.
• The inequality in terms of bargaining power between large-scale
corporations and small farmers and other marginalised groups increases the
likelihood of unfair agreements. Contracts tend to be signed in favour of the
party negotiating from a greater position of strength. That is why government is
required to bridge the gap and bring balance to this relationship.
• A legitimate need for acquisition by the state itself (to build
public goods such as roads, schools and hospitals) can be undermined and stalled
by groups with vested interests. If there is no sovereign power to compel these
groups, a single individual or group of individuals can hold a process hostage
merely by refusing to part with land. Further, in times of crisis such as war,
famine and floods, coupled with absence of legislation clarifying and guiding
the state’s exercise of ‘eminent domain’, situations can emerge jeopardising
human lives.
What are the highlights of the new Bill?
• Compensation: Given the inaccurate nature of circle rates, the
Bill proposes the payment of compensations that are up to four times the market
value in rural areas and twice the market value in urban areas.
• R&R: This is the very first law that links land acquisition
and the accompanying obligations for resettlement and rehabilitation. Over five
chapters and two entire Schedules have been dedicated to outlining elaborate
processes (and entitlements) for resettlement and rehabilitation. The Second
Schedule in particular outlines the benefits (such as land for land, housing,
employment and annuities) that shall accrue in addition to the one-time cash
payments.
• Retrospective operation: To address historical injustice the Bill
applies retrospectively to cases where no land acquisition award has been made.
Also in cases where the land was acquired five years ago but no compensation has
been paid or no possession has taken place then the land acquisition process
will be started afresh in accordance with the provisions of this act.
• Multiple checks and balances: A ‘comprehensive, participative and
meaningful’ process (involving the participation of local Panchayati Raj
institutions) has been put in place prior to the start of any acquisition
proceeding. Monitoring committees at the national and state levels to ensure
that R&R obligations are met have also been established.
• Special safeguards for tribal communities and other disadvantaged
groups: No law can be acquired in scheduled areas without the consent of the
Gram Sabhas. The law also ensures that all rights guaranteed under such
legislation as the Panchayat (Extension to Scheduled Areas) Act 1996 and the
Forest Rights Act 2006 are taken care of. It has special enhanced benefits
(outlined in a dedicated chapter) for those belonging to Scheduled Castes and
Scheduled Tribes.
• Safeguards against displacement: The law provides that no one
shall be dispossessed until and unless all payments are made and alternative
sites for the resettlement and rehabilitation have been prepared. The Third
Schedule even lists the infrastructural amenities that have to be provided to
those that have been displaced.
• Compensation for livelihood losers: In addition to those losing
land, the Bill provides compensation to those who are dependent on the land
being acquired for their livelihood.
• Consent: In cases where PPP projects are involved or acquisition
is taking place for private companies, the Bill requires the consent of no less
than 70% and 80% respectively (in both cases) of those whose land is sought to
be acquired. This ensures that no forcible acquisition can take place.
• Caps on acquisition of multi-crop and agricultural land: To
safeguard food security and to prevent arbitrary acquisition, the Bill directs
states to impose limits on the area under agricultural cultivation that can be
acquired.
• Return of unutilized land: In case land remains unutilized after
acquisition, the new Bill empowers states to return the land either to the owner
or to the State Land Bank.
• Exemption from income tax and stamp duty: No income tax shall be
levied and no stamp duty shall be charged on any amount that accrues to an
individual as a result of the provisions of the new law.
• Share in appreciated land value: Where the acquired land is sold
to a third party for a higher price, 40% of the appreciated land value (or
profit) will be shared with the original owners.
How are interests and concerns of farmers protected?
• Consent: Prior-consent shall be required from 70% of land losers
and those working on government assigned lands only in the case of
public-private partnership projects and 80% in the case of private companies.
This consent also includes consent to the amount of compensation that shall be
paid.
• Return of unutilized land: Land not used can now be returned to
the original owners if the state so decides.
• Share in sale of acquired land increased: The share that has to
be distributed among farmers in the increased land value (when the acquired land
is sold off to another party) has been set at 40%.
• Income-tax Exemption: All amounts accruing under this act have
been exempted from income tax and from stamp duty.
• Strict restrictions on multi-crop acquisition: The acquisition of
agricultural land and multi-crop land has to be carried out as a last resort.
There will be definite restrictions on the extent of acquisition of such land in
every state to be determined by the States concerned.
• Safeguards to ensure fair price: Given the way in which market
value is to be calculated and the imposition of a solatium of 100% over and
above the amount, the farmers are guaranteed a fair price for their land.
• Acquisition only if necessary: The Collector has to make sure
that no other unutilized lands are available before he moves to acquire farm
land.
• Damage to crops to be included in price: The final award has to
include damage to any standing crops which might have been harmed due to the
process of acquisition (including the preliminary inspection).
• Share in developed land: In case their land is acquired for
urbanization purposes 20% of the developed land will be reserved and offered to
these farmers in proportion to the area of their land acquired and at a price
equal to the cost of acquisition and the cost of development.
• Fishing rights: In the case of irrigation or hydel projects,
affected families may be allowed fishing rights in the reservoirs.
• Additional R&R benefits: Farmers are also entitled to the
various rehabilitation and resettlement benefits which are enumerated in
response to question 2.
• Time-bound social impact assessment: The Bill mandates a social
impact assessment of every project which must be completed within a period of
six months.
What are the rehabilitation and resettlement provisions for
farmers, landless and livelihood losers?
• Reduced qualifying criteria: To qualify for benefits under this
Act the time period has been reduced to three years of dependence (on the
acquired land) from five.
• Affected family to include tenants: The definition of affected
family includes agricultural labourers, tenants including any form of tenancy or
usufruct right, share-croppers or artisans who may be working in the affected
area for three years prior to the acquisition, whose primary source of
livelihood stands affected by the acquisition of land.
• Houses for all affected families: All affected families are
entitled to a house provided they have been residing in an area for five years
or more and have been displaced. If they choose not to accept the house they are
offered a one-time financial grant in lieu of the same.
• Choice of annuity or employment: All affected families are given
a choice of annuity or employment;
i. If employment is not forthcoming they are entitled to a one-time
grant of Rs.5 lakh per family.
ii. Alternatively they will provided with an annuity payment of
Rs.2,000 per month per family for 20 years (this
will be adjusted for inflation).
• Subsistence allowance: All affected families which are displaced
from the land acquired shall be given a monthly subsistence allowance equivalent
to Rs.3,000 per month for a period of one year from
the date of award.
• Training and skill development: All affected families are also
given training and skill development while being offered employment.
• Miscellaneous amounts: All affected families are given multiple
monetary benefits such as transport allowance of Rs.50,000 and resettlement allowance of Rs.50,000.
• One-time financial assistance: Each affected family of an
artisan, small trader or self-employed person shall get one-time financial
assistance of such amount as the appropriate government may, by notification,
specify subject to a minimum of Rs.25,000.
• R&R to be completed in all aspects for irrigation projects:
In case of acquisition of land for irrigation or hydel project the
rehabilitation and resettlement shall be completed six months prior to
submergence of the lands proposed to be so acquired.
• Possession upon fulfilment of conditions under Act: The Collector
shall take possession of land only ensuring that full payment of compensation as
well as rehabilitation and resettlement entitlements are paid or tendered to the
entitled persons within a period of three months for the compensation and a
period of six months for the monetary part of rehabilitation and resettlement
entitlements commencing from the date of the award. However, families will not
be displaced from this land till their alternative R&R sites are ready for
occupation.
• Time Limit for provision of R&R entitlements: The components
of the Rehabilitation and Resettlement Package in the Second and Third Schedules
that relate to infrastructural entitlements shall be provided within a period of
18 months from the date of the award.
How are interests and concerns of scheduled castes and schedules
tribes protected?
• Approval: As far as possible no acquisition shall take place in
the Scheduled Areas. And where such acquisition does take place it has to be
done with the approval/ consent of the local institutions of self-governance
(including the autonomous councils where they exist).
• Development plan: A Development Plan has to be prepared laying
down the details of procedure for settling land rights due but not settled and
restoring titles of tribals on alienated land by undertaking a special drive
together with land acquisition. The Plan must also contain a programme for
development of alternate fuel, fodder and non-timber forest produce resources on
non-forest lands within a period of five years sufficient to meet the
requirements of tribal communities as well as the Scheduled Castes.
• One-third to be paid up-front: In case of land being acquired
from members of the Scheduled Castes or the Scheduled Tribes, at least one-third
of the compensation amount due shall be paid to the affected families at the
outset as first instalment and the rest shall precede the taking over of the
possession of the land.
• Resettlement in the same scheduled area: The Scheduled Tribes
affected families shall be resettled preferable in the same Scheduled Area in a
compact block so that they can retain their ethnic, linguistic and cultural
identity.
• Land for community: The resettlement areas predominantly
inhabited by the Scheduled Castes and the Scheduled Tribes shall get land, to
such extent as may be decided by the appropriate Government free of cost for
community and social gatherings.
• Alienation of tribal lands to be void: Any alienation of tribal
lands or lands belonging to members of the Scheduled Castes in disregard of the
laws and regulations for the time being in force shall be treated as null and
void: and in the case of acquisition of such lands, the rehabilitation and
resettlement benefits shall be available to the original tribal land owners or
land owners belonging to the Scheduled Castes.
• Fishing rights: The affected Scheduled Tribes, other traditional
forest dwellers and the Scheduled Castes families having fishing rights in a
river or pond or dam in the affected area shall be given fishing rights in the
reservoir area of the irrigation or hydel projects.
• If resettled outside scheduled area then additional benefits:
Where the affected families belonging to the Scheduled Castes and the Scheduled
Tribes are relocated outside of the district then they shall be paid an
additional twenty-five per cent rehabilitation and resettlement benefits to
which they are entitled in monetary terms along with a one-time entitlement of
fifty thousand rupees.
• Higher land-for-land area for SCs/STs: In every project those
losing land and belonging to the Scheduled Castes or Scheduled Tribes will be
provided land equivalent to land acquired or two-and-a-half acres, whichever is
lower (this is higher than in the case of non-SC/ST affected families)
• Additional amounts: In addition to a subsistence amount of rupees
3000 per month for a year (which all affected families get), the Scheduled
Castes and the Scheduled Tribes displaced from Scheduled Areas shall receive an
amount equivalent to rupees 50,000.
How are interests and concerns of panchayati raj institutions
protected?
• SIA in consultation with PRIs: The Social Impact Assessment (SIA)
has to be carried out in consultation with the representatives of the Panchayati
Raj Institutions (PRIs). In fact, the appropriate Government is required by the
law to ensure adequate representation of these institutions during the discharge
of the process.
• SIA reports to be shared: Reports prepared under the Social
Impact Assessment are to be shared with these individuals in their local
language along with a summary.
• Representation in expert group: The expert group has to have two
members belonging to the Panchayati Raj Institutions. This is a powerful body
that has the power to reject a project.
• Hearings in all gram sabhas: In case where an affected area
involves more than one Gram Panchayat or Municipality, public hearings shall be
conducted in every Gram Sabha where more than twenty five per cent of land
belonging to that Gram Sabha is being acquired.
• Consultation in compliance with PESA: Consultation with the Gram
Sabha in scheduled areas under the Fifth Schedule referred to in the
Constitution shall be in accordance with the provisions of the Provisions of the
Panchayats (Extension to the Scheduled Areas) Act, 1996.
• Representation of panchayat chairpersons on R&R committee at
project level: The Rehabilitation and Resettlement Committee at Project Level
has to have the chairpersons of the Panchayats located in the affected area or
their nominees as representatives.
• Panchayat ghars have to be provided as per the list of
Infrastructural amenities given in the Third Schedule.
How are states interests and concerns protected?
• Choice for return to land bank or owner: Where unutilized land is
returned the state can decided whether it goes to the original owner or to the
land bank.
• Threshold for private purchase left to government: While the Bill
requires the discharge of obligations related to Resettlement and Rehabilitation
(R&R) even in the case of private purchase provided the purchase exceeds a
certain threshold, it leaves the said threshold to the discretion of the state
governments.
• In extreme cases, equivalent amount for multi-crop land: While
the Bill seeks to discourage acquisition of irrigated multi crop or agricultural
land it gives the choice of earmarking how much of such lands should be reserved
for protection against acquisition to the States. Furthermore if no alternative
land is available to replace the multi-crop land acquired, the state can
instruct the payment of an equivalent amount.
• R&R procedure at discretion of state: The procedure related
to the functioning of the R&R committee at project-level has been left to
the state government if the acquisition is by the state.
• States free to enact other laws: The state governments are free
to enact any law to enhance or add to the entitlements enumerated under the Bill
which confers higher compensation than payable under the Bill or make provisions
for rehabilitation and resettlement which are more beneficial than those
provided under the Bill.
How does the compensation mechanism work?
• In urban areas there is no multiplier. This means no enhancement
of the market value calculated occurs.
However a solatium of 100% (which currently exists at 30%) is
imposed on this market value calculated. This ‘solatium’ amount is a
compensation to ameliorate the pain of forcible acquisition.
• In rural areas the multiplier has been left entirely to the
discretion of state governments which may range on a sliding scale from 1 to 2
depending on the radial distance from urban centres.
What are the safeguards in the law to ensure food security?
• Special provisions have been inserted in the Law to ensure that
multi-crop land is acquired only as a last resort.
• States are also required to impose limits on the area of
agricultural/ multi-crop land that can be acquired in a State. No acquisition of
such lands in excess of that limit can take place.
• When acquiring agricultural land, the state has to cultivate an
equivalent area of land elsewhere as agricultural land. If they cannot do this
then they must deposit an amount equivalent to its value in an account to be
used for the purposes of enhancing food security.
How are investor concerns addressed?
• Consent: In the case of public-private partnership projects
consent has been reduced from 80% to 70%. In additional only the consent of land
owners is required.
• Definition of market value has been amended to ensure that
acquisition price doesn’t form the basis for compensation calculation in future
acquisitions. Also power has been given to the Collector to not consider
transactions which he feels are outliers and not indicative of true value while
calculating market value. Earlier there was a danger of a price-spiral as (a
multiple of) price of first acquisition in an area would go into calculation of
land price for any subsequent acquisitions
• States given large flexibility: A sliding scale will give states
flexibility to fix compensation in rural areas (between two and four times
market value), depending on their distance from urban areas. Earlier
compensation in rural areas was to be four times market value.
• Restrictions/thresholds on amount of irrigated multi‐crop land
and net sown area per district or state available for acquisition left to the
discretion of states. Earlier amount of irrigated multi-cropped irrigated land
that could be acquired was capped at 5%, and amount of net sown area that could
be acquired was also capped.
• Land size thresholds on when R&R on private purchase of land
becomes applicable has now been left to the discretion of States. Earlier
R&R on private purchases was to apply to all acquisitions above 100 acres in
rural areas and 50 acres in urban areas.
• Payment for R&R costs by acquirer made a ‘one-off’ acquirer
to put all monies in an escrow account, and ongoing commitments like annuities
and benefits to be administered by agency established under this Act. Earlier
the Buyer would have had to pay and be involved with R&R infrastructure
building until complete, and R&R annuities to perpetuity. However, families
will not be displaced from this land till their alternative R&R sites are
ready for occupation.
• Collector can be considered appropriate government: In cases
where the land sought to be acquired is below a certain threshold then the
Collector can be the acquiring authority.
Why are there 157 amendments being made to this Bill?
• Substantive changes: These are significant changes. They bring
about new provisions or thoroughly alter existing provisions on any area.
Example: Changes in quantum of consent required, process for determining
compensation etc.
• Minor changes: These are changes which are new additions but are
of such a nature that they do not alter the provisions of the Bill as it was
originally drafted. Example: adding time limits to existing processes. These do
not fundamentally alter the process.
• Typographical /nomenclature/ definitional changes: These are
minor modifications which correct errors in type or clarify definitions which
already exist. Example: replacing the term ‘project affected persons’ with
‘project affected families’.
What are these 26 substantive amendments?
The 26 substantive amendments are given below. 13 amendments that
have been made in accordance with the recommendations of the standing committee
are as follows:
1. Revised definition of public purpose and revised consent
requirements: Given the observations made by the standing committee that the
definition of public purpose needed reworking, an amendment has been made which
collates the previously scattered definition of public purpose and streamlines
it to make it easier to understand.
2. Restrictions on multi-crop land acquisition left to the states:
In response to the recommendations made by the standing committee that since
states better understand the peculiar and unique circumstances in their regions,
the fixation of the cap should be left to them, an amendment has been made to
allow state governments to fix the limits on the acquisition of multi-crop
land.
3. Restrictions on agricultural land acquisition left to the
states: In response to the recommendations made by the standing committee that
since states better understand the peculiar and unique circumstances in their
regions, the fixation of the cap should be left to them, an amendment has been
made to allow state governments to fix the limits on the acquisition of
agricultural land.
4. Restrictions on private purchase of land left to the states: In
response to the recommendations made by the standing committee that since land
purchase falls within the legislative domain of the States they should be
allowed to fix the limits of private purchase. If these limits are crossed then
the rehabilitation and resettlement provisions of this law will apply.
5. Second amendment on restriction of private purchase: A second
amendment in furtherance of the preceding amendment has been made to empower
states in the fixation of purchase limits.
6. Additional compensation in case of double displacement: A new
section has been inserted to provide for additional compensation if n affected
family is displaced twice.
7. Special provisions for scheduled castes and scheduled tribes:
Special provisions have been inserted specifically for scheduled castes and
scheduled tribes in the body of the Act. These include greater benefits and
enhanced safeguards.
8. Provision for reservation and other benefits: This amendment has
been inserted specifically for scheduled castes and scheduled tribes in the body
of the Act in continuation of the previous amendment.
9. State-level monitoring committee: A state-level monitoring
committee has been established on the recommendations of the standing committee
to provide supervision over R&R functions.
10. Period for return of unutilized land reduced: The period for
the return of unutilized land has been reduced to 5 years from 10 years.
11. unutilized land may be returned to the original owners: An
amendment has been made which allows the state governments the option to return
the land to the original owners if they so decide.
12. Extension of the new law to exempted Acts: In response to the
recommendation made by the standing committee, an amendment has been made to
extend the provisions of this Act to all the exempted legislations in the fourth
schedule within a period of one year of its commencement.
13. The provisions relating to scheduled castes and scheduled
tribes have been removed from the schedule to the law: And bought into the main
legislation as recommended by the Standing Committee.
The 13 amendments have been made in accordance with the
recommendation of the group of ministers are as follows:
2. Retrospective operation: To correct historical injustices, a
retrospective clause allowing certain classes of individuals to benefit from
enhanced compensation and rehabilitation and resettlement has been provided
for.
3. Revised social impact assessment process: A revised provision
for a more thorough social impact assessment process in consultation with
unutilized raj institutions has been drafted.
4. Power to override recommendations of expert group: It was felt
by many individuals that a non-elected group of individuals should not be given
final authority over whether acquisition should be allowed to proceed or not. As
a result an amendment has been made to allow the Government concerned to
override them but only if they have sufficient reasons that are recorded in
writing.
5. New responsibilities for the collector: New amendments have been
made to ensure the collector updates the land records so that compensation can
be paid on true and accurate values.
6. Power to appropriate government to raise R&R: An amendment
has been made to enable the appropriate government to raise the rate of
rehabilitation and resettlement to take into account for inflation.
7. Power to taking possession only after satisfying obligations:
Section 37 which deals with taking possession of the land has been strengthened
to ensure that the collector shall only take possession of the land “after
ensuring that” the compensation/ R&R responsibilities have been
discharged.
8. Waiver of income tax and stamp duty: To further ameliorate the
suffering of displaced families, the Act has exempted them from the payment of
income tax and stamp duty for amounts received under this law.
9. Power to divert land in exceptional cases: If land acquired for
one purpose cannot be used for that purpose due to an unforeseen calamity, then
the appropriate government may use it for another purpose.
10. Increase in share of appreciated value: If the government after
acquiring the land sells it to a third party then 40% of the appreciated value
will be shared with the original owners. This has been increased from 20%.
11. Limit on benefit from sale of acquired land: In addition to the
preceding amendment, an additional amendment has been made to limit this benefit
to only the first time the land is sold after acquisition.
12. Multiplier to calculate compensation: Flexibility has been
given to the states to fix the multiplier by which the compensation will be
calculated. In other words states can give up to four times the market value but
it can be lower if they chose to fix a lower multiplier.
13. Offer for developed land: A new amendment has been made which
provides that in the case of acquisition for urbanisation purposes, 20% of the
developed land will be reserved and offered to the original owners at a price
equal to the cost of acquisition and development.